It’s been awfully quiet at TA-21 this week.
And it’s not because of the latest discovery last Friday when a 1940s-era truck was unearthed by an excavator working at the site.
Fred DeSousa of the Los Alamos National Laboratory Communications Department on Thursday morning confirmed there was a problem with the transformer on site.
“We didn’t have any electricity and we use that to run the air filtration system,” DeSousa said. “We can’t do any work inside the enclosures unless we have an air filtration system.”
DeSousa said the problem occurred Saturday afternoon when the winds were high.
“We don’t know for sure if the high winds caused the problem, but we had equipment failure in our high voltage supply.
“Some of the electrical systems powering the filtration systems need a certain type of power and there was damage to one of the systems.”
DeSousa said power has been restored to one of the four enclosures where excavation is being done.
“What we do when we resume operations is that we go through a step-by-step process and prove we can get the systems back up,” DeSousa said. “It’s a very methodical process.”
None of the businesses on DP Road had any interruption in power service.
If you currently subscribe or have subscribed in the past to the Los Alamos Monitor, then simply find your account number on your mailing label and enter it below.
Click the question mark below to see where your account ID appears on your mailing label.
If you are new to the award winning Los Alamos Monitor and wish to get a subscription or simply gain access to our online content then please enter your ZIP code below and continue to setup your account.
| ZIP Code: | |