.....Advertisement.....
.....Advertisement.....

Construction Zone 06-12-11

-A A +A

Public Works Projects:
For more information about the projects listed below,
e-mail lacpw@lacnm.us or call 662-8150.
Diamond Drive Phase 4 2011
Canyon / Diamond: On June 13, the contractor will re-open Canyon after 8:30 am.
Northbound from the Bridge – No left turns onto West or Trinity; use Sandia. No left or right onto Canyon Road; use University.  The right turn slip lane onto eastbound Trinity is closed; motorists in the right lane must turn right onto eastbound Trinity at the signalized intersection. The left lane continues through the work zone.
Southbound from University Drive – Expect two southbound lanes south of Sandia.  The left lane is a left turn lane at Trinity Drive.  The right lane is the through lane for traffic crossing the bridge, as well as right turns onto University, Trinity, and West Road.  Left turns onto West Road are okay, however, the dedicated left turn lane will no longer be present.