.....Advertisement.....
.....Advertisement.....

Cone Zone 4-28-13

-A A +A

 

Public Works Projects:

For more information about the projects listed below, please e-mail lacpw@lacnm.us, call

662-8150, or visit the “Projects” link at www.losalamosnm.us. Please slow down and use caution as you travel through these construction areas.

Eastern Area 2 Concrete, Paving & Utility Project – Phase 2:

Canyon Road is closed to through traffic between 9th Street and 15th Street. Local motorists can expect daytime flagging operations in this area with minor delays. Two-way traffic will be restored in the evenings and weekends when work is not occurring.

The contractor will begin removal of sidewalk, curb, and gutter on the west side of Canyon Road, leaving the concrete intact on the east side of the road for pedestrian use.

Mesa Public Library Safety Improvements:

The contractor will begin mobilization on Monday, April 29. The roadway in front of the library will be closed between the two library parking lots. Handicapped parking access is available from Bathtub Row. Pedestrians are urged to use the provided pedestrian pathways and to watch for construction activity.

Upcoming Construction: Western Area Phase 1

This project includes pavement rehabilitation on 41st, 42nd, 43rd, and 44th Streets off Trinity, including concrete replacement and reconstruction of the sidewalk paths from the above streets to the Western Area Park. Council award of construction is scheduled for April 30, with an estimated start of construction by mid-May.

Other Resources:

Construction updates are posted at www.losalamosnm.us each Friday explaining traffic control to be expected for the following week – link to News/The Cone Zone. Or, subscribe to The Cone Zone newsletter and receive automatic traffic updates via e-mail each week – just visit the “Newsletters” link on the home page and click on “The Cone Zone” subscribe box.